High Efficiency
Supports simultaneous loading and compression with single or multiple cycles, enhancing efficiency with high loading capacity and compaction.
Powerful Protection –No Sewage or Odor Escape
Painting Process:All structural components are coated using electrophoretic painting, ensuring 6–8 years of corrosion resistance for enhanced durability and reliability;
Horseshoe-shaped sealing strips are used for superior oxidation resistance, corrosion protection, and leak prevention;
A filler cover is installed at the filler opening to shield the hopper, preventing garbage spillage and odor leakage.
Items | Parameter | Remark | |
Approved Parameters |
Vehicle |
CL5184ZYSBEV
|
|
Chassis |
CL1180JBEV
|
||
Weight Parameters |
Max.Gross Vehicle Weight(kg) | 18000 | |
Curb Weight(kg) | 11500,11850 | ||
Payload(kg) | 6370,6020 | ||
Dimension Parameters |
Overall Dimensions(mm) | 8935,9045,9150×2550×3200 | |
Wheelbase(mm) | 4500 | ||
Front/Rear Overhang(mm) | 1490/2795 | ||
Front/Rear Wheel Track(mm) | 2016/1868 | ||
Power Battery | Type | Lithium Iron Phosphate | |
Brand | CALB | ||
Battery Capacity(kWh) | 194.44 | ||
Chassis Motor | Type | Permanent Magnet Synchronous Motor | |
Rated/Peak Power(kW) | 120/200 | ||
Rated/Peak Torque(N·m) | 500/1000 | ||
Rated /Peak Speed(rpm) | 2292/4500 | ||
Additional Parameters |
Max.Vehicle Speed(km/h) | 90 | / |
Driving Range(km) | 300 | Constant Speed Method | |
Charging Time(min) | 35 | 30%-80%SOC | |
Superstructure Parameters |
Container Capacity
|
13m³ | |
Packer Mechanism Capacity | 1.8m³ | ||
Packer Sewage Tank Capacity
|
520L | ||
Side-Mounted Sewage Tank Capacity
|
450L | ||
Loading Cycle Time
|
≤25s
|
||
Unloading Cycle Time
|
≤45s | ||
Lifting Mechanism Cycle Time
|
≤10s | ||
Hydraulic System Rated Pressure
|
18MPa | ||
Bin Lifting Mechanism Type | · Standard 2×240L plastic bins · Standard 660L bin lifterSemi-Sealed Hopper (Optional) |